Groundwater Remediation at Pinedale Industrial Site

Groundwater Remediation at Pinedale Industrial Site
The Pinedale Industrial Site project involved the remediation of a large chlorinated solvent plume that threatened local groundwater resources. Our team conducted a comprehensive site assessment, including soil, soil vapor, and groundwater investigations.

Key Achievements:
  • Designed and implemented a full-scale groundwater extraction and treatment system.
  • Worked closely with regulatory agencies to meet compliance standards.
  • Reduced contaminant levels by over 90% within the first year of operation.
This project required extensive coordination with the City of Fresno Water Division to ensure that municipal water wells remained unaffected during remediation efforts.

Water Quality Improvement at Caruthers Raisin Packing Facility

Water Quality Improvement at Caruthers Raisin Packing Facility
The Caruthers Raisin Packing Facility faced significant challenges with wastewater discharge and compliance with state regulations. Our team was brought in to assess the situation and design a solution that met the stringent requirements of the Regional Water Resources Control Board.

Key Achievements:
  • Prepared a Report of Waste Discharge (ROWD) for continued operation.
  • Designed a groundwater monitoring network to ensure ongoing compliance.
  • Implemented modifications to the existing water supply system to improve efficiency.
As a result of our work, the facility was able to secure necessary permits and continue operations without disruption.

Stormwater Management for Southern California Edison

Stormwater Management for Southern California Edison
This project involved the design and implementation of stormwater management practices for multiple Southern California Edison substations. Our team served as Qualified Stormwater Practitioners (QSPs), overseeing compliance with state regulations.

Key Achievements:
  • Conducted regular inspections to ensure compliance with stormwater pollution prevention plans (SWPPPs).
  • Developed and submitted Certificates of Inspection (COIs) and annual reports to regulatory bodies.
  • Implemented best management practices (BMPs) to minimize the impact of stormwater runoff.
This project significantly improved the environmental compliance of the substations, ensuring continued operation in line with state regulations.

Environmental Impact Assessment for Highway 99 Expansion

Environmental Impact Assessment for Highway 99 Expansion
The expansion of Highway 99 required a thorough environmental impact assessment (EIA) to evaluate potential effects on local ecosystems and communities. Our team was tasked with conducting this assessment and providing recommendations to mitigate any adverse impacts.

Key Achievements:
  • Completed a comprehensive geohazard assessment to identify potential risks.
  • Developed mitigation strategies to protect sensitive habitats along the highway corridor.
  • Collaborated with local and state agencies to ensure all environmental requirements were met.
The project was completed successfully, allowing the highway expansion to proceed with minimal environmental disruption.